
6 Operation
41 K-439 Operation Manual, Version A
If applicable, follow the previous steps to install a suction module on a second rack.•
Switch on the Scrubber or water jet pump and activate the fume hood ventilation.•
➡The rack(s) can now safely be processed in the SpeedDigester.
Note
Clean all glass parts before mounting to avoid cross contamination.•
When a water jet pump is used, hazardous vapours can escape into the environmental air if the •
suction is inadequate.
If a Scrubber without condensation step is used, the condensate that accrues must be absorbed •
by means of a Woulff bottle between the SpeedDigester K-439 and the Scrubber.
When operating with 3rd party sample tubes no insulation caps and glass caps are available. In •
this case, all positions must be equipped with samples!
When operating with 300 ml sample tubes, close unused positions with a glass cap towards the •
suction unit.
6.7.4 Installing 500 ml sample tubes
Unlike 300 ml (and 250 ml) sample tubes, 500 ml tubes can not simply be inserted into the appro-
priate rack. The information in this section serves to set up this type of sample tube properly and
safely in the rack.
Installation steps:
For installation and handling all parts must be < 40 °C!
1
2
3
frontside
rear side
Plug the rack into the carrier • 1.
➥ Two audible *click* sounds will appear as soon as the rack is securely locked at the carrier!
➥ Check the locking by lifting the rack together with the carrier (carrier must follow the rack)
Kommentare zu diesen Handbüchern