
5 Putting into operation
23
KjelFlex K-360 Operation Manual, Version C
5 Putting into operation
This chapter describes how the instrument is installed and gives instructions on initial startup.
NOTE
Inspect the instrument for damages during unpacking. If necessary, prepare a status report immedia-
tely to inform the postal company, railway company or transportation company.
Keep the original packaging for future transportation.
5.1 Installation site
Install the instrument on a clean, flat and stable base and place the tanks for chemicals beside the
instrument (not higher and not more than 1 m lower).
Notice
Reduced instrument safety and lifetime due to improper handling and installation location.
Do not place any object on top of the instrument.•
Keep a free safety space of 30 cm around the instrument.•
Do not place items behind the instrument.•
Do not operate the instrument within an fume cabinet.•
5.2 Electrical connections
Fig. 5.1: Electrical connections
WARNING
Death or serious burnings by electric shock.
Mains voltage must match the voltage reading on the type plate.•
Instrument must be earthed by the mains socket.•
Only use a molded 3-pole device plug (IEC-60320, type C13 or C15).•
Do not use damaged cables.•
Kommentare zu diesen Handbüchern